Central Station, Sydney NSW

Peel Away 8

A recently commissioned project to remove the painted surface of the tiled walls on Platforms 24 & 25 at Central Railway Station, Sydney. The works included the Platform signage, some of which had been painted over multiple times in various colours and all tiled walls which had been painted with a 2Pac Epoxy system. Peel Away 8 was specified as the preferred product and the results were spectacular, receiving praise from client and contractor.

The process was over a four week period on a night shift so as not to inconvenience station customers. There is no residue smell and the walls were additionally covered with corflute over the Peel Away Paper to ensure the integrity of the works during busy customer times. The works went without problem with the Peel Away being removed 24 hours after application and then scraping and pressure washing completed the works to the desired result.

To find out more about this project including Contractor details, please call our offices on 02 9746 6733

IMG_0459-resize_300px
WE ARE OPEN - Delivery or Click and collect available. Tech advice 02 9746 6733
This is default text for notification bar